top of page
Roof Upgrade at Manufacturing Facility
Mc Cabe Group.png

Food Manufacturing

Roof Upgrade at Manufacturing Facility

We’ve recently completed a major roof refurbishment project at a live production facility in Co. Cavan, covering approx. 5,000m² across the front of house and higher warehouse roof.

Our Sectors

Diverse Sector Expertise

IMG_2919_websize.jpg

Commercial Sector

Our latest commercial project showcases our commitment to quality and innovation. Completed ahead of schedule, it has already received accolades for its design and functionality.

IMG_0585_websize.jpg

Pharma

At McCabe Group, we understand that the pharmaceutical industry demands the highest quality standards. Our dedicated team ensures that every project adheres to stringent regulations.

abbots.jpg

Healthcare

At McCabe Group, we specialize in delivering comprehensive project management services tailored for healthcare facilities. Our experienced team ensures that every project is completed.

Lakeland.jpg

Food Manufacturing

At McCabe Group, we specialize in delivering high-quality construction solutions tailored for the food manufacturing sector. Our commitment to safety, innovation, and integrity.

IMG_3311_websize.jpg

Tech

At McCabe Group, we take pride in our groundbreaking projects within the tech sector. Our approach combines cutting-edge technology with expert craftsmanship to deliver exceptional.

IMG_0663_websize.jpg

Cleanrooms

Cleanrooms require meticulous engineering to ensure optimal conditions for sensitive processes. Our team specializes in creating controlled environments that meet stringent industry.

IMG_4817_websize.jpg

Specialist Civils

With extensive experience in complex civil engineering projects, McCabe Group excels in delivering innovative solutions. Our commitment to quality and safety ensures successful outcomes across Ireland and Europe.

Residential Homes

Residential

At McCabe Group, we take pride in our completed residential projects that showcase our commitment to quality and innovation. Each project reflects our expertise in handling diverse and complex residential needs.

Location

Cavan

Client

Confidential

Timeline

June - October 2025

Design Team

Michael Fitzpatrick Architects
ORS Consulting Engineers
MEP Mechanical & Electrical Engineers

McCabe Group

Key Features

  • Installation of SIKA Warm Roof System with 20-year guarantee

  • Raising of parapet walls & installation of tapered valleys and gutters

  • Temporary removal & reinstatement of critical M&E plant and services

  • Integration of rooflights, vents, smoke vents & modern lightning protection

  • Designated rooftop walkways, edge protection & crash decks for safe delivery

Certifications & Memberships

McCabe Group | ISO-Certified Main Contractor & Construction Specialists

At McCabe Group, we combine over three generations of construction expertise with a commitment to quality and safety. Our award-winning team is dedicated to delivering exceptional projects across Ireland and Europe, ensuring client satisfaction every step of the way.

  • Facebook
  • Instagram
  • LinkedIn

Contact Us

Derrylea, Ballyjamesduff, Co. Cavan, Ireland. A82 Y2W5

Newsletter

Irish Construction Industry Awards

Irish Construction Awards Winner 2025

Irish Construction Excellence

Irish Construction Excellence Shortlisted 2024

Irish Construction Industry Awards

Irish Construction Awards Shortlisted 2023

Roof Upgrade at Manufacturing Facility

McCabe Group

Roof Upgrade at Manufacturing Facility

Delivered directly above a live production environment, the works required careful planning and coordination to ensure zero disruption to operations across high, medium, and low care areas, while maintaining the highest standards of safety, quality, and compliance.


The project involved the full strip and removal of the existing roofing systems and the installation of a high-performance SIKA Warm Roof System, backed by a 20-year guarantee. Works included the careful coordination of activities to minimise disruption to production within a live manufacturing environment, along with the raising of perimeter parapet walls, installation of new tapered valleys and gutters, and provision of designated rooftop walkways for long-term access and safety. To support the new roof design, the project also required the temporary removal, diversion, and reinstatement of critical M&E plant and services, as well as alterations to existing sprinkler pipework. Additional upgrades included the reinstatement of rooflights, vents, and smoke vents, the integration of new insulation and membrane systems, and the installation of a modern lightning protection system. 

Delivered with stringent safety measures, including full edge protection and temporary crash decks, the works have successfully modernised and futureproofed the facility.

bottom of page