top of page
Pharmaceutical Lab Expansion
Mc Cabe Group.png

Cleanrooms

Pharmaceutical Lab Expansion

A complex live-site transformation, McCabe Group converted existing office areas into world-class cleanroom laboratories for this client — delivered on time, to the highest quality, and without disrupting ongoing production.

Our Sectors

Diverse Sector Expertise

IMG_2919_websize.jpg

Commercial Sector

Our latest commercial project showcases our commitment to quality and innovation. Completed ahead of schedule, it has already received accolades for its design and functionality.

IMG_0585_websize.jpg

Pharma

At McCabe Group, we understand that the pharmaceutical industry demands the highest quality standards. Our dedicated team ensures that every project adheres to stringent regulations.

abbots.jpg

Healthcare

At McCabe Group, we specialize in delivering comprehensive project management services tailored for healthcare facilities. Our experienced team ensures that every project is completed.

Lakeland.jpg

Food Manufacturing

At McCabe Group, we specialize in delivering high-quality construction solutions tailored for the food manufacturing sector. Our commitment to safety, innovation, and integrity.

IMG_3311_websize.jpg

Tech

At McCabe Group, we take pride in our groundbreaking projects within the tech sector. Our approach combines cutting-edge technology with expert craftsmanship to deliver exceptional.

IMG_0663_websize.jpg

Cleanrooms

Cleanrooms require meticulous engineering to ensure optimal conditions for sensitive processes. Our team specializes in creating controlled environments that meet stringent industry.

IMG_4817_websize.jpg

Specialist Civils

With extensive experience in complex civil engineering projects, McCabe Group excels in delivering innovative solutions. Our commitment to quality and safety ensures successful outcomes across Ireland and Europe.

Residential Homes

Residential

At McCabe Group, we take pride in our completed residential projects that showcase our commitment to quality and innovation. Each project reflects our expertise in handling diverse and complex residential needs.

Location

Cootehill, Co.Cavan

Client

Confidential

Timeline

45 Weeks

Design Team

Michael Fitzpatrick Architect
MEP Mechanical and Electrical Engineering
ORS Consulting Engineers

McCabe Group

Key Features

  • 120 m2 of ISO Class 7 and 300 m2 of CNC Cleanroom spaces delivered, including 2no laboratories, ancillary test rooms, sample preparation areas and personnel changing zones.

  • Over 300 linear meters of modular cleanroom partitions system installed, with 18 HEPA filter units and 2 pass-through chambers

  • Labs designed to accommodate 40 technicians and 6 lab coordinators across two shifts fitted out with bespoke benchspace and seating

  • 100% validation pass rate achieved in first time testing including particle counts, airflow velocity, room pressurization, temperature and humidity control.

  • Maintained >15 Pa differential between labs and adjacent test rooms, sample preparation areas and personnel changing zones

  • Accelerated fit-out of the first laboratory to enable an earlier handover to the client in response to increased operational demand, completed 3 weeks ahead of schedule

Certifications & Memberships

McCabe Group | ISO-Certified Main Contractor & Construction Specialists

At McCabe Group, we combine over three generations of construction expertise with a commitment to quality and safety. Our award-winning team is dedicated to delivering exceptional projects across Ireland and Europe, ensuring client satisfaction every step of the way.

  • Facebook
  • Instagram
  • LinkedIn

Contact Us

Derrylea, Ballyjamesduff, Co. Cavan, Ireland. A82 Y2W5

Newsletter

Irish Construction Industry Awards

Irish Construction Awards Winner 2025

Irish Construction Excellence

Irish Construction Excellence Shortlisted 2024

Irish Construction Industry Awards

Irish Construction Awards Shortlisted 2023

Pharmaceutical Lab Expansion

McCabe Group

Pharmaceutical Lab Expansion

The project commenced with the decommissioning, dismantling and removal of old office space & meeting rooms and full strip out of all M&E services in the ceiling void and plant mezzanine areas. Remedial structural and civil works were carried out to the existing shell to accomodate the new layout and services. New fire rated partitions were constructed ahead of the full M&E install. Cleanroom specialists supplied and installed the new cleanroom laboratory fabric to include wall, floor and ceiling finished. 


Bespoke bench space was designed for both laboratories, to include the install of sinks, taps, fume hoods and extract arms. All systems were tested, commissioned and validated on completion.

bottom of page